HEX
Server: nginx/1.28.3
System: Linux ip-172-31-12-242 6.17.0-1007-aws #7~24.04.1-Ubuntu SMP Thu Jan 22 21:04:49 UTC 2026 x86_64
User: root (0)
PHP: 7.4.33
Disabled: passthru,exec,system,putenv,chroot,chgrp,chown,shell_exec,popen,proc_open,pcntl_exec,ini_alter,ini_restore,dl,openlog,syslog,readlink,symlink,popepassthru,pcntl_alarm,pcntl_fork,pcntl_waitpid,pcntl_wait,pcntl_wifexited,pcntl_wifstopped,pcntl_wifsignaled,pcntl_wifcontinued,pcntl_wexitstatus,pcntl_wtermsig,pcntl_wstopsig,pcntl_signal,pcntl_signal_dispatch,pcntl_get_last_error,pcntl_strerror,pcntl_sigprocmask,pcntl_sigwaitinfo,pcntl_sigtimedwait,pcntl_exec,pcntl_getpriority,pcntl_setpriority,imap_open,apache_setenv
Upload Files
File: //usr/share/cmake-3.28/Help/command/include_external_msproject.rst
include_external_msproject
--------------------------

Include an external Microsoft project file in a workspace.

.. code-block:: cmake

  include_external_msproject(projectname location
                             [TYPE projectTypeGUID]
                             [GUID projectGUID]
                             [PLATFORM platformName]
                             dep1 dep2 ...)

Includes an external Microsoft project in the generated workspace
file.  Currently does nothing on UNIX.  This will create a target
named ``[projectname]``.  This can be used in the :command:`add_dependencies`
command to make things depend on the external project.

``TYPE``, ``GUID`` and ``PLATFORM`` are optional parameters that allow one to
specify the type of project, id (``GUID``) of the project and the name of
the target platform.  This is useful for projects requiring values
other than the default (e.g.  WIX projects).

.. versionadded:: 3.9
  If the imported project has different configuration names than the
  current project, set the :prop_tgt:`MAP_IMPORTED_CONFIG_<CONFIG>`
  target property to specify the mapping.